Year of Completion: 2013
General Contractor: Cove Construction
Despite the 2010 recession the Cherry Creek Dentistry practice was flourishing and in need a of new home. A former banking site was selected with only an old foundation in the way for the new, contemporary dental practice. Local flagstone was an important design element to the client that carried on both the inside and out. Natural daylight was brought through large picture windows in the treatment areas and a high clerestory down the main corridor. Finally, subtle interior curves are used throughout the interior to soften the clinical feel of the space.
Year of Completion: 2013
General Contractor: Cove Construction
Despite the 2010 recession the Cherry Creek Dentistry practice was flourishing and in need a of new home. A former banking site was selected with only an old foundation in the way for the new, contemporary dental practice. Local flagstone was an important design element to the client that carried on both the inside and out. Natural daylight was brought through large picture windows in the treatment areas and a high clerestory down the main corridor. Finally, subtle interior curves are used throughout the interior to soften the clinical feel of the space.